What Is a Construction Phase Plan? A Plain-English CDM 2015 Guide

Under the Construction (Design and Management) Regulations 2015, a construction phase plan (CPP) must be drawn up before the construction phase begins. It applies to every project, including small and domestic jobs.
Who is responsible?
The principal contractor prepares the plan. Where only one contractor is involved, that contractor prepares it. The client must make sure it is in place before work starts.
What should it include?
The plan should be proportionate to the project's risks. Typical contents:
- A description of the project and key dates
- Management structure and responsibilities
- Site rules and welfare arrangements
- Arrangements for controlling significant risks such as work at height, excavations and asbestos
- Emergency and communication arrangements
Keep it live
The CPP is not a one-off document. Review and update it as the work progresses and risks change. Our construction phase plan template gives you a ready structure, or our CDM consultants can prepare it for you.
More insights
March 4, 2025
The Future of Safety Training: Why Virtual Solutions Are Here to Stay
May 5, 2025
Top 5 Mistakes Companies Make with HSE Compliance — and How to Avoid Them
June 6, 2025
Why Every Workplace Needs a Custom Safety Program in 2025
October 7, 2026
Risk Assessment vs Method Statement: What's the Difference?
October 7, 2026
Do I Need a Health and Safety Policy? UK Rules for Small Businesses