Construction & CDM Hub

Construction Safety & CDM 2015 Support You Can Build On

Real CDM deliverables — pre-construction information, construction phase plans, designer risk registers, site inspections and a complete health & safety file.

Construction manager and engineer reviewing plans on a building site with tower cranes at sunset
Construction & CDM Hub
CDM 2015 · Site Safety · Documents & Training
CDM 2015 Duty Holder Support

Every Duty Holder Covered, From Design to Handover

The Construction (Design and Management) Regulations 2015 place legal duties on everyone involved in a project. Whether you're a client, designer, principal contractor or subcontractor, our consultants help you understand and discharge your duties — and leave you with the documents that prove it.

Category 01

CDM 2015 Duty Holder Support

Tailored support for every role defined under CDM 2015 — from client briefings to principal contractor services on site.

CDM 2015
Clients

We make sure your CDM client duties are discharged and evidenced — the duties HSE inspects first.

  • Client duty briefing and written duty-holder matrix
  • Principal Designer & Principal Contractor appointment letters
  • Pre-construction information (PCI) pack issued to bidders
  • F10 notification prepared and submitted
  • Review of the Construction Phase Plan before work starts
  • Health & Safety File received, checked and archived
Principal Designers & Designers

Design risk managed and recorded, so eliminated and residual risks are provable at handover.

  • Designer risk register (eliminate / reduce / inform)
  • Design risk review workshops and minutes
  • Pre-construction information collated and issued
  • Coordination of designers through each design stage
  • Residual risk drawings and notes for the contractor
  • Health & Safety File compiled and handed to the client
Principal Contractors & Contractors

Site-ready documents and inspections that stand up to a client audit or an HSE visit.

  • Construction Phase Plan (CPP) written to your programme
  • Task-specific RAMS reviewed and approved
  • Site induction pack, toolbox talks and training matrix
  • Permit-to-work, temporary works and lifting plan controls
  • Scheduled site inspections with photographic reports
  • Accident and near-miss investigation support
What you actually receive

CDM Deliverables, Not Advice Notes

Every engagement ends with documents you can issue, audit and hand over. These are the outputs we produce.

Pre-Construction Information pack

Site, existing structure, asbestos, services, access and client rules collated into one issued PCI document for tender.

Construction Phase Plan

Project-specific CPP covering organisation, arrangements, site rules, welfare, emergency and high-risk works — not a template with your logo on.

Designer risk register

Recorded design decisions showing what was eliminated, what was reduced and what residual risk is passed downstream.

F10 notification

Notifiable projects identified and the F10 prepared, submitted and displayed on site correctly.

Site inspection reports

Scheduled visits with a photographic report, prioritised actions, owners and close-out tracking.

Health & Safety File

Compiled through the project and handed over complete — as-builts, residual risks, maintenance and O&M links.

Project timeline

Who Does What, And When

How CDM duties and outputs map across the life of a project.

01
Pre-construction
Client & Principal Designer

Duty-holder matrix, appointments, PCI pack, F10

02
Design
Designers & Principal Designer

Design risk register, design review minutes, residual risk notes

03
Mobilisation
Principal Contractor

Construction Phase Plan, site set-up check, induction pack

04
Construction
Principal Contractor & Contractors

RAMS reviews, inspections, permits, temporary works, incident support

05
Handover
Principal Designer & Client

Health & Safety File, close-out report, lessons learned

Category 02

Site Safety & Compliance Services

Hands-on support for live sites and pre-qualification — keeping your workforce safe and your tenders winning.

Site Safety Services
  • Scheduled site inspections & audits
  • Accident & incident investigation
  • Temporary works coordination
  • Fire plans & emergency procedures
  • Permit-to-work systems
  • Lifting plans & craneage support
Competence & Compliance
  • Contractor vetting & pre-qualification
  • SSIP support (CHAS, SafeContractor, Constructionline)
  • CSCS & competence checks
  • CDM compliance gap analysis
  • HSE inspection readiness
  • Ongoing competent advice (CDM reg. 7)
Category 03

Construction Documents & Training

Ready-to-use construction RAMS, forms and training from our Documents Hub and Academy — expertly written and fully editable.

Construction Risk Assessments & RAMS

Ready-to-use construction risk assessments, method statements and lifting plans — fully editable to your site and trade.

Templates & Forms

Site diaries, induction records, permits, inspection checklists and temporary works registers.

Construction Training

CDM awareness, site management safety and toolbox-talk resources for your workforce.

Common questions

CDM 2015, answered

Keep your project safe, compliant and on programme

Tell us the project, your role and your dates — we'll come back with scope, deliverables and a fixed price.